After an unsatisfactory EICR, read the full observations and limitations, address C1, C2 and FI matters with appropriate urgency, scope evidence-led work and retain verification of completion. This guide explains what the decision depends on without treating age, appearance or a headline price as property evidence. Record the condition, access, intended result and available documents, then ask which points still require inspection, design or testing before accepting a recommendation.
Read the complete report before commissioning work
Do not rely on the summary page alone. C1 danger requires immediate action. For this part of the brief, distinguish the customer's known requirement from the installation evidence. Agreeing the purpose, extent and limitations of the inspection provides one route to that evidence. If access prevents confirmation, record the missing fact and the consequence instead of silently treating it as satisfactory.
This section changes the work only when the evidence justifies it. Start with the technical principle: classification codes require competent judgement and context. Then assess the practical effect of distribution-board identification; neither should be inferred from the headline query. The sequence includes issuing the report and explaining priorities, and the completed record may include recorded extent and limitations according to the work delivered.
- Do not rely on the summary page alone.
- C1 danger requires immediate action.
Evidence for read the complete report before commissioning work
Do not rely on the summary page alone. C1 danger requires immediate action. Record the access available on the day and explain how any limitation narrows the conclusion that can safely be drawn.

Prioritise classifications correctly
C2 and FI observations require urgent attention. C3 recommendations do not alone make the report unsatisfactory. These are connected questions rather than separate checklist items. Use explaining likely disruption and any operational constraints to establish the starting condition and note the source of each answer. A photograph or previous document can guide the visit, but it should not be presented as a current electrical test result.
Turn the answer into an auditable scope by recording the technical principle clearly: an EICR reports on the condition of an existing installation at the time of inspection. Then address the practical factor of availability of previous certificates and circuit information. State when visual inspection of accessible installation components occurs, what must be available at that point and who approves a variation. Where applicable, completed Electrical Installation Condition Report then closes the chain from initial question to tested result.
- C2 and FI observations require urgent attention.
- C3 recommendations do not alone make the report unsatisfactory.
Evidence for prioritise classifications correctly
C2 and FI observations require urgent attention. C3 recommendations do not alone make the report unsatisfactory. Keep the original evidence with the decision so a future owner or electrician can understand why the scope took this form.
Arrange further investigation where required
Clarify any observation wording with the inspector. Further investigation may precede a repair quotation. The practical value is in showing which answer can be agreed now and which remains conditional. Reviewing available certificates and previous reports should be scheduled at the point where it can genuinely influence scope, before finishes, equipment orders or programme promises make a different result costly.
Use this technical principle when assessing the property: limitations must be recorded rather than hidden. The related practical factor is tenant or occupier access. The programme should identify recording observations using the applicable classification system as a checkpoint and explain how a changed finding will be communicated. The final handover record, including separate certification for later remedial work where applicable, must describe the circuits and work actually covered.
- Clarify any observation wording with the inspector.
- Further investigation may precede a repair quotation.
Evidence for arrange further investigation where required
Clarify any observation wording with the inspector. Further investigation may precede a repair quotation. Note whether each fact came from observation, a current document, electrical testing or an assumption that still needs confirmation.

Define and verify remedial work
Separate mandatory response from optional improvement. Test completed work using the appropriate process. Together they define a hold point for unsatisfactory EICR. Record the available property information, carry out confirming access to the consumer unit, circuits and representative accessories where relevant and name the person who can resolve the remaining question. This keeps a provisional allowance visibly provisional.
Apply this principle to the real installation: a report outcome is never guaranteed before inspection. Then review sensitive equipment and planned isolation, because it may alter access, equipment or sequencing. Visual inspection of accessible installation components becomes the relevant delivery checkpoint, with schedule of inspections and test results retained where it applies to the completed work.
- Separate mandatory response from optional improvement.
- Test completed work using the appropriate process.
Evidence for define and verify remedial work
Separate mandatory response from optional improvement. Test completed work using the appropriate process. Record the access available on the day and explain how any limitation narrows the conclusion that can safely be drawn.
Update the property evidence pack
Retain completion evidence with the original EICR. Check current landlord deadlines where they apply. Read those points together before drawing a conclusion about unsatisfactory EICR. Agreeing the purpose, extent and limitations of the inspection separates what can be seen or supplied in advance from the facts that require access or test evidence. Any unresolved condition belongs in the limitations, not inside a confident-sounding fixed assumption.
A competent proposal links design, delivery and evidence. The design question is how this principle applies: classification codes require competent judgement and context. The delivery question concerns recording observations using the applicable classification system, while the handover question is which evidence, including recorded extent and limitations, is required. Distribution-board identification can affect all three, so it should not be left to an informal site conversation.
- Retain completion evidence with the original EICR.
- Check current landlord deadlines where they apply.
Frequently asked questions
What should I confirm first about unsatisfactory EICR?
Do not rely on the summary page alone. C1 danger requires immediate action. Those two facts give the first conversation a defined starting point without treating an unvisited property as a standard package.
Which site evidence can change the answer for unsatisfactory EICR?
Clarify any observation wording with the inspector. Further investigation may precede a repair quotation. Inspection or test evidence should override an assumption made from age, appearance, photographs or another property.
How should unsatisfactory EICR appear in a quotation?
Separate mandatory response from optional improvement. Test completed work using the appropriate process. The quotation should identify inclusions, exclusions and any provisional item whose final scope depends on opening, inspection or testing.
Which records matter after work connected with unsatisfactory EICR?
Retain completion evidence with the original EICR. Check current landlord deadlines where they apply. Keep the applicable report, certificate, notification, schedules and change record with the property documents.
Sources and further reading
- Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
- Electrical Safety First guidance
- NICEIC consumer and contractor guidance
This guide provides general information and is ready for technical review before publication. Regulations and official guidance can change.